Quality Assurance, Product Development, and Purchasing Strategies in China

  • Home
  • Articles
    • How To Manufacture A Product In China (without losing your shirt)? [Importer’s Guide]
  • Best Of
  • About Us
  • Contact us
X

Don't miss a post

It's easy to subscribe to our newsletter where you'll receive weekly updates for professional importers and manufacturers on better understanding, controlling, and improving manufacturing & supply chain in China, India, Vietnam, and beyond.

You are here: Home / New Product Development / 4 Tips for Production Launch of an Electronic Product in China

4 Tips for Production Launch of an Electronic Product in China

November 11, 2015 by Renaud Anjoran

New Product IntroductionThese days it seems more and more “hardware startups” are coming to Shenzhen and working with Chinese manufacturers to launch production of electronic products. And they typically find out that their supplier hasn’t prepared correctly for the launch process.

Many of these startups have little manufacturing experience and don’t know where to pay the most attention. They tend to rely too much on the OEM supplier and overlook several critical factors that we listed below.

1. Starting off on the right foot

Incoming Quality Control

The quality of the final product directly depends upon the quality of the components that go into it; therefore, it is essential that all parts are inspected before they are used in any final assembly. An unfortunate habit of many Chinese suppliers is to buy substandard components in order to make more margin. If you discover this after half the order quantity is finished, it is way too late.

A procedure for inspecting all incoming components and parts is necessary. This is the stage where any faulty parts delivered by the supplier should be identified and put to one side and quarantined, thus preventing them from being distributed to production.

All Incoming Quality Control (IQC) should be carried out in accordance with a sampling plan. If you shoot for high quality a good sampling plan would be based on the following standard: ISO2959-1, LEVEL II, SINGLE SAMPLING with an acceptance quality limit (AQL) of Critical Defects: 0.4%, Major Defect: 0.65%, Minor Defect: 1.0%. Make sure you tell your supplier about this in advance, since it is considered pretty strict by most Chinese factories.

For most electronic products, many components are purchased by the OEM manufacturer. Ideally, you can screen and qualify the critical sub-suppliers rather than relying on your direct supplier.

Inspectors Responsibility

Best practice for electronic component inspection begins with product handling.  Ideally, inspectors would take the Electrostatic Discharge Sensitive Safety Standard (ESDS) training and continue to use all the correct procedures throughout their work. This knowledge is critical for receiving inspections and shipping preparation.

Purpose of IQC

  1. To distinguish good lots from bad lots
  2. To distinguish good pieces from bad pieces.
  3. To determine if the sub-suppliers’ process is changing.
  4. To determine if the sub-suppliers’ process is approaching the specification limits.
  5. To rate the quality of the components.
  6. To measure the precision of the measuring instrument.
  7. To secure products – design information.
  8. To evaluate supplier performance

 

 

2. Good Planning

Having suppliers deliver good quality components and goods with virtually zero defects is obviously the ideal scenario, however, without good planning, your product launch could possibly go astray with respect to scheduling from a launch date.

To ensure your new product has a smooth and successful launch and to maximize productivity you need a solid production plan, however, generating an effective plan is a complex process. A cross-functional team need to work together to ensure that materials, equipment and human resources are available when and where they are needed.

A production plan is like a roadmap: it helps you know where and when you are going and how long it will take to get there. I am shocked at how few factories do a proper plan. If they simply give you a shipment date, it is a red flag.

You must request a detailed plan that shows when each component will be delivered, when they will train the operators, when they will do small runs, when they will do mass production, etc. And then you need to check with a manufacturing expert whether the plan is realistic.

 

3. Flow Line Organization

In order to prepare the flowline for a new product introduction, it is paramount that prototypes and pre-production units have already been run. This allows for machine setting and line parameters to be understood and recorded so that every aspect of the flow line is ready for the first production run.

Making sure the flow line is organized from start to finish includes all the peripheral elements such as feeders, inspection stations both in-line and off-line as well as making sure all the equipment has been set up and functioning correctly.

Processes

If you want to check how well organized your OEM manufacturer is, I advise sending an engineer to conduct a process audit.

 

4. Measure and Improve

Define, Measure, Analyze, Improve and Control (DMAIC) is a structured problem-solving method. Each phase builds on the previous one, with the goal of implementing long-term solutions to problems.

DMAIC

The DMAIC method is the preferred method for improving a system that has either high risk or the problems are complex (note that, on an SMT flowline, both of these scenarios fit within these criteria). Optimizing the production flow line and eliminating problems and issues, as well as having an evergreen improvement plan in place, will ensure your new product has a relatively smooth launch.

—

What are your experiences with launching production of a new electronic product in China? Any questions? Please leave them as a comment.

 


Are you designing, or developing a new product that will be manufactured in China?

Sofeast has created An Importer’s Guide to New Product Manufacturing in China for entrepreneurs, hardware startups, and SMEs which gives you advance warning about the 3 most common pitfalls that can catch you out, and the best practices that the ‘large companies’ follow that YOU can adopt for a successful project.

It includes:

  • The 3 deadly mistakes that will hurt your ability to manufacture a new product in China effectively
  • Assessing if you’re China-ready
  • How to define an informed strategy and a realistic plan
  • How to structure your supply chain on a solid foundation
  • How to set the right expectations from the start
  • How to get the design and engineering right

Just hit the button below to get your copy (please note, this will direct you to my company Sofeast.com):

An Importers Guide to New Product Manufacturing in China

Filed Under: New Product Development Tagged With: China, electronic products, hardware startups, new product launch


Weekly updates for professional importers on better understanding, controlling, and improving manufacturing & supply chain in China.

This is the official blog of Sofeast.com.

This blog is written by Renaud Anjoran, an ASQ Certified Quality Engineer who has been involved in chinese manufacturing since 2005.

Hit the button below to get in touch:

Contact Us!

Subscribe to our email newsletter

Connect with us

  • Email
  • Facebook
  • LinkedIn
  • RSS
  • Twitter
  • YouTube
sofeast
sofeast
sofeast

Latest Articles

  • The 8-Step Customer Journey Manufacturers Need To Consider
  • Looming EU Sustainability Requirements Will Force You To Get Visibility Into Your Supply Chain
  • The ISO Certification Industry’s Dark Side
  • 5-Step Process Reliability Engineers Follow To Fix Product Returns
  • Product Recall Program: How to do it in case of a Safety Issue?

Categories

  • Quality Control Tips
  • Sourcing New Suppliers
  • Supplier Management
  • New Product Development
  • Process Improvement
  • Ethical Sourcing

Archives

© 2023 QualityInspection.org